DAVID ATELIER
PORSCHE 964 RESTORATION · PART 5 OF 6

PORSCHE 964 RESTORATION: ASSEMBLY BEGINS

In Part 5 of the restoration series, the freshly painted Porsche 964 returns to DAVID ATELIER. The chassis, axles, wiring, oil, and air conditioning system, as well as numerous reconditioned original parts, are being reinstalled step by step.

THE EMPTY CHASSIS IS BEING TURNED INTO A PORSCHE 964 AGAIN

After disassembly, bodywork, painting, and engine overhaul, one of the most exciting phases of the entire project is now beginning: the rebuild.

The painted body is back at the DAVID ATELIER and is being reassembled from front to back. Wiring, axles, the suspension, the oil and air conditioning systems, as well as numerous brackets and components, are being returned to their original locations.

This process clearly demonstrates just how much detailed work goes into a comprehensive restoration. Many components were not simply replaced, but rather cleaned, sandblasted, re-galvanized, or powder-coated and then reused.

PORSCHE 964 ASSEMBLY: WHAT HAPPENS IN PART 5?

AXLES & SUSPENSION

The front and rear axles are being rebuilt. New bearings, remanufactured wheel carriers, and the KW V3 HLS—which has already been prepared—are being installed in their final positions in the vehicle.

LINES & SYSTEMS

Oil lines, fuel lines, brake lines, vent lines, and the HLS hydraulic lines are rerouted neatly along their original paths.

REMANUFACTURED ORIGINAL PARTS

Screws, brackets, and other components are retained whenever possible. Original parts that are still in good condition are cleaned, galvanized, or powder-coated instead of being replaced across the board with new parts.

PREPARING FOR THE WEDDING

The engine compartment, trunk, oil system, and air conditioning system are being finalized so that the engine, transmission, and interior can be installed in the next phase of the project.

ASSEMBLY OF THE PORSCHE 964 BEGINS

Following the paint job and extensive preparation, the restoration of the Porsche 964 begins.

The body is back at DAVID ATELIER and is now being fully restored, step by step. The team is working its way through the vehicle from front to back.

A lot of the work was already prepared while the body was still on the rolling stand. It’s much easier to install wiring—especially in the sill area—when the body is in this condition.

Next come the axles, suspension, wiring, and numerous small components that turn the painted body into a complete vehicle once again.

RETAIN ORIGINAL PARTS INSTEAD OF REPLACING THEM EN MASSE

An important principle of the project is also upheld during assembly: components that are still in good working order are reused whenever possible.

Instead of simply replacing usable original parts, they are cleaned, refurbished, and recoated as needed.

Screws and metal parts, for example, are sent for galvanizing. This restores their high-quality appearance while also providing them with new corrosion protection.

Components are replaced with new ones only if they are severely damaged or corroded.

This ensures that as much of the vehicle’s original structure as possible is preserved.

THE FRONT AXLE IS BEING REBUILT

Numerous components have already been installed on the front axle.

The cross members, side members, and other chassis parts are back in place. Many bolts have been freshly galvanized, while individual fasteners that were excessively worn have been replaced.

The wheel carrier has also been completely refurbished.

The housing has been recoated, a new wheel bearing has been pressed in, and the wheel hub has been freshly galvanized.

Step by step, the individual restored components are being reassembled into a complete front axle.

THE KW V3 HLS FINDS ITS FINAL HOME

The KW V3 with hydraulic HLS—which was already prepared in Part 2—is now finally being integrated into the vehicle.

The pressure lines were cut to the required length and neatly installed.

The HLS system’s high-pressure pump is now located where the spare tire used to be.

From there, the lines run both forward and backward to the individual dampers.

This means that the technical foundation for the hydraulic lift function is now firmly integrated into the vehicle.

THE REAR AXLE WILL ALSO BE OVERHAULED

Work is also progressing on the rear axle.

The axle beams were glass bead blasted, while the sheet metal and bolted joints were recoated or galvanized.

In addition, the swing arm will be fitted with a new main bearing.

The old bearing was clearly worn out and is therefore being replaced with a slightly stiffer version.

This not only restores the vehicle to its original condition, but also specifically enhances its future handling characteristics.

THE PORSCHE IS BACK ON ITS OWN WHEELS

Now that the second side of the car has also been completed, the Porsche can stand on its own wheels again for the first time.

This marks an important milestone.

The completely disassembled and painted body is being transformed back into a drivable vehicle.

However, the actual reassembly is far from complete.

WIRES AND CONNECTIONS ARE RETURNING TO THEIR PROPER PLACES

Numerous systems have now been fully reinstalled under the vehicle.

These include, among other things:

  • Fuel Lines
  • Brake lines
  • Vent lines
  • Vent lines
  • Oil lines
  • HLS Hydraulic lines

All components were cleaned, inspected, and refurbished as needed prior to installation.

As a result, the traces of the complete disassembly gradually disappear.

THE ENGINE COMPARTMENT IS BEING PREPARED FOR THE ENGINE

A lot has already happened under the hood, too.

A new engine insulation mat has been installed, the housing vents and lines are back in place, and the power steering reservoir and a new fuel filter have also been installed.

The wiring was also neatly rerouted.

Cables and wires were cleaned, partially rewrapped, and then reinstalled along their original routes.

This prepares the engine compartment, step by step, for the eventual installation of the fully overhauled engine.

EVEN INVISIBLE PARTS ARE RECONDITIONED

Attention to detail is not limited to components that will remain visible in the finished vehicle.

Even brackets, screws, and small metal parts—which are barely visible after assembly—were cleaned or re-galvanized.

This is precisely where the commitment to a comprehensive restoration is evident.

The vehicle should look high-quality not only in the areas where it is immediately visible, but also in the areas that will remain largely hidden later on.

THE OIL SYSTEM IS BEING COMPLETELY REBUILT

The oil system is also already largely complete.

A new oil filter is combined with the reconditioned oil filter housing. The connections have been re-galvanized, the housing components have been glass-bead blasted, and the oil lines have been replaced.

The system continues on to the newly reconditioned oil tank and the thermostat housing.

Revised connections and new wiring are also being used there.

Finally, the oil flows to the oil cooler assembly in the front of the vehicle, which was also cleaned and refitted with a new oil cooler.

THE AIR CONDITIONING UNIT AND PIPING ARE BACK IN THE VEHICLE

At the same time, the air conditioning system is being rebuilt on the driver’s side.

The air conditioning condenser is already in place, and the corresponding lines have been routed through the side sill.

Other components are also being replaced or prepared.

This means that another important component of the vehicle is now ready for final assembly.

BBS LE MANS AND THE LARGER BRAKE SYSTEM IN THE FIRST TEST

The BBS Le Mans wheels, which are the final choice, are being installed on a trial basis.

In particular, they check whether the wheels are compatible with the larger braking system and whether there is sufficient clearance.

Only when all the components fit together can the final ride height and axle geometry be determined later.

THE TRUNK IS ALMOST FULLY EQUIPPED

Assembly is also nearing completion in the front section.

The wiper linkage, heater housing, and numerous lines are back in their original places.

Various components of the heating system were replaced, including the evaporator and some of the air conditioning lines.

The fuse box has also been reinstalled.

As a result, even the previously completely empty trunk regains its original structural configuration.

THE GAS TANK AND ABS MODULE HAVE BEEN REINSTALLED

The fuel tank has now been securely bolted in place.

The ABS module is back in place as well and has been fitted with a newly powder-coated bracket.

Screws and pipes were refurbished or re-galvanized.

The expansion tank for the brakes and clutch has also been reinstalled.

As a result, more and more technical systems are now fully operational.

THE NEXT BIG STEP: ENGINE, TRANSMISSION, AND INTERIOR

With the axles, chassis, wiring, and key technical systems in place, a large part of the reconstruction is now complete.

The next phase of the project will focus on the bodywork details, the interior trim, and the installation of the engine and transmission.

The so-called “wedding” marks one of the most important moments of the entire restoration process.

After that, the Porsche 964 will finally be nearing completion.

 

KEY FACTS FROM PART 5

01
: RESTORATION BEGINS
The freshly painted Porsche is being completely rebuilt from front to back.
02
RECONDITIONED ORIGINAL PARTS
Many existing components are cleaned, galvanized, or powder-coated and then reused.
03
CHASSIS & SYSTEMS
KW V3 HLS, front and rear axles, as well as the oil, fuel, brake, and air conditioning systems, are fully integrated once again.
04
READY FOR THE WEDDING
The engine compartment and vehicle engineering have been prepared to the point where the engine, transmission, and interior can be installed in the next step.

RESTORATION ALSO MEANS REUSE

Part 5 highlights an aspect that is barely visible on a fully restored car body:

how many original parts actually make their way back into the vehicle.

Not every older component needs to be replaced automatically.

If screws, brackets, wiring, or other components are still technically sound, they can be professionally cleaned and refurbished.

This preserves the original substance and conserves resources, while still restoring the vehicle to a very high standard both technically and visually.

THE PROJECT CONTINUES

The Porsche is back on its wheels, and the most important technical systems have been reinstalled in the vehicle.

Now, all that’s missing are the components that will finally turn it back into a complete car.

NEXT PART OF THE PROJECT

PORSCHE 964 RESTORATION · PART 6 OF 6

THE MOST IMPORTANT QUESTIONS ABOUT ASSEMBLING THE PORSCHE 964

What work is carried out in Part 5?
After painting, the Porsche is fully reassembled. Axles, suspension, wiring, oil, and the air conditioning system, as well as numerous other components, are reinstalled.
Are all the old parts replaced during restoration?
No. Original parts that are in good technical condition are, whenever possible, preserved, cleaned, re-galvanized, or otherwise refurbished, and then reused.
Which suspension system is installed in the Porsche 964?
The KW V3 with a hydraulic HLS system continues to be used.
Where is the HLS pump located?
The high-pressure pump is located in the area of the former spare tire in the front of the vehicle.
What work was performed on the axles?
Wheel carriers, axle arms, bearings, wheel hubs, metal plates, and bolted connections were inspected, cleaned, and, in some cases, recoated or replaced.
Which systems have already been reinstalled?
These include fuel lines, oil lines, brake lines, air conditioning lines, vents, electrical components, and the HVAC system.
Are the BBS Le Mans wheels already installed?
They are being installed on a trial basis during this phase to test their free movement in conjunction with the larger brake system.
When will the engine be installed?
The engine compartment will be prepared in Part 5. The engine and transmission are to be installed in the next phase of the project.

CONCLUSION: THE PORSCHE 964 IS BECOMING A CAR AGAIN

Part 5 is the moment when the many individually restored components are reassembled to form a complete Porsche once again.

The axles and suspension are back in place, the lines are being reconnected, the oil and air conditioning systems are being topped off, and even the smallest brackets and screws have been refurbished.

This phase of the project thus illustrates particularly well just how crucial the assembly process is to the quality of a restoration.

Because only now will it become clear whether all the individual components from the previous phases of the project actually function as a complete system.

The Porsche 964 is back on its own wheels.

Now all that’s missing is the engine, transmission, and interior—then the project will be nearing completion.

TRANSCRIPT OF THE PROJECT EPISODE

Part 5 of the Porsche 964 restoration shows the reassembly following the completion of the paintwork.

Axles, KW V3 HLS suspension, lines, oil, and the air conditioning system, as well as numerous restored original parts, are being reinstalled. At the same time, the engine compartment and trunk are being prepared for the next steps.

This episode thus marks the first time we see a Porsche 964 being transformed, step by step, from a completely disassembled body into a roadworthy vehicle.

VIEW FULL TRANSCRIPT

00:00

PART 5: ASSEMBLY BEGINS

The painted Porsche 964 Carrera 2 is back at DAVID ATELIER. Now the final assembly of the vehicle begins. Felix is overseeing the rebuild and shows the first components that have already been installed.

00:30

THE FIRST WIRING IS INSTALLED

While the vehicle was still on the rolling stand, the first wiring was installed in the side sills. Then, the systematic reassembly begins from front to back.

01:00

ORIGINAL PARTS ARE BEING REFURBISHED

Components in good condition are reused whenever possible. Screws and metal parts, for example, are re-galvanized to preserve the original material while restoring them to high-quality condition.

01:20

CROSS MEMBERS AND LONGITUDINAL BEAMS ARE REINSTALLED

The cross members and longitudinal members have already been installed. Freshly galvanized screws are used where the original fasteners were still worth keeping.

01:45

MAIN BRAKE CYLINDER AND OIL LINES

The master cylinder has been reinstalled. The refurbished oil lines are also back in the sill area.

02:40

THE FRONT AXLE IS TAKING SHAPE

The wheel carrier, new wheel bearing, and freshly galvanized wheel hub have been reinstalled. Powder-coated sheet metal and other refurbished components are also being put in place.

03:25

THE HLS PRESSURE LINES ARE BEING INSTALLED

The hydraulic landing gear pressure lines are cut to the required length. The high-pressure pump is installed in the area where the spare tire used to be.

03:50

THE REAR AXLE IS ALSO BEING ASSEMBLED

The swing arm was glass bead blasted and is being fitted with a new, slightly stiffer main bearing. The metal plates and bolted connections were also refurbished.

04:35

THE PORSCHE CAN STAND ON ITS OWN WHEELS AGAIN

Now that both sides of the vehicle are complete, the chassis is finished. The Porsche can now stand on its own wheels again for the first time.

04:55

ALL WIRING IS BACK IN THE VEHICLE

Vent lines, fuel lines, brake lines, and other systems are back in their proper positions.

5:25

PREPARING THE ENGINE COMPARTMENT

A new engine insulation mat, vent lines, power steering reservoir, and fuel filter have been installed. The electrical components and wiring have also been cleaned and neatly rerouted.

05:55

EVEN HIDDEN COMPONENTS ARE RESTORED

Even components that are barely visible after reassembly have been cleaned, galvanized, or otherwise refurbished.

06:15

THE OIL SYSTEM IS ALMOST COMPLETE

The oil filter, oil filter housing, connections, lines, and oil tank were reconditioned or replaced and reinstalled in the vehicle.

06:50

THERMOSTAT AND OIL COOLER

The reconditioned thermostat housing is combined with freshly galvanized fittings and new oil lines. The cleaned oil cooler assembly, featuring a new oil cooler, is installed in the front of the vehicle.

07:10

THE AIR CONDITIONING SYSTEM RETURNS

The air conditioning condenser and lines are being reinstalled. Other components, such as the dryer, will be replaced later on.

7:30 a.m.

BBS LE MANS AND LARGER BRAKES UNDER TEST

The final set of wheels is being test-fitted to check for proper clearance in conjunction with the larger brake system.

07:50

THE TRUNK IS ALMOST FINISHED

The wiper linkage, heater housing, wiring, and fuse box are back in their proper places.

08:25

THE GAS TANK AND ABS MODULE ARE INSTALLED

The fuel tank has been securely bolted in place. The ABS module has also been reinstalled with a freshly refurbished bracket, bolts, and wiring.

8:50

PREPARING THE BRAKES AND CLUTCH

The reservoir will later supply the brakes and clutch with brake fluid. This means that other key systems are now fully prepared again.

09:00

THE NEXT STEP: ENGINE, TRANSMISSION, AND INTERIOR

The next phase of the project will involve additional bodywork details, interior finishing, and the installation of the engine and transmission. With this, the restoration is approaching its final phase.

THE PROJECT CONTINUES

Porsche 911 F-Model Market Analysis with Benjamin David and Thomas Ottenstroer

JORGE IS DONE

It’s FINISHED! – Porsche 964 Project